Well I have had more work since July than before I retired. Did some relief Master work for Solent Towage on the Apex and Tenax. 3 weeks working the Esso contract at Fawley. Much different to what I was used to. Very well equipped tugs with superb accomodation.

Apex, Fawley.

Some of it was escort work from the pilot boarding area south of the Nab Tower to Fawley then berthing, some 25 miles and 6-7 hours.

Then I went back to take the Thrax to Frederikshavn, Denmark for her refit. Cruising down the Solent we passed the PS Waverley.

Waverley in the Solent

It was a 3 day trip with good weather all the way, arrived safe and sound then I caught a flight to Gat wick and home.

Thrax in Frederikshavn

Now I am relieving back at Dover til Christmas. I find the relief work quite good as I can virtually come and go as it suits me. I hope there will be more with Solent Towage as they are such a good outfit and the work is interesting.