Work is going well today Paul has removed some pebble dash around the cracks above the kitchen window and below the bathroom window. The cracks in the pebble dash were quite small. But in the brick underneath a different story.
Above Kitchen

Below Bathroom

But inside a happier result we thought the brickwork above the interior doors would have to be cut out with all the mess it would entail. Not so exposing above the first door and there is wooden lintels on wooden blocks so that immediately above the door is hollow face with plaster board.

The cracking is not to bad either so the job is going to be easier than expected, not a bad day so far.